Who can apply for new water connection?
Any resident of Malviya Nagar getting water supply from malviya UGR Delhi - Owner of premises/Tenant/Occupier who has valid identity as proof of residence/ownership/NOC from the owner of the house.
Where can one get an application form for new water connection?
The application form is available at every office of Consumer Service Center of MNWS (Annexure – ‘I') at a nominal fee of Rs.10 towards the cost of the form and processing fee. One can visit MNWS consumer portal and MNWS portal from where the form can also be downloaded. At the time of depositing the payment for new connection, Rs. 10/- is required to be deposited along with it if the form is downloaded from the site.
The application forms can be submitted, on all working days in the office of concerned
Consumer Contact Center.
What are the requirements for sanction of new water connection?
Any resident of Malviya Nagar Delhi can apply for water connection to DJB subject to the following conditions:-
• The colony where the applicant resides should have been taken over by the MNWS for water supply.
• It is technically and legally feasible to supply water.
• The applicant should have proof of residence like Ration Card, Voter's Identity Card, Ownership proof or NOC from the owner of the house, if the applicant is tenant / occupier.
• The premises for which the water connection is applied for must have no arrears of previous dues on account of water charges etc.
Can a person obtain more than one water connection for the same premise?
Yes, subject to technical and legal feasibility.
What are the charges for obtaining a new water connection?
The following charges are required to be paid at the time of sanction of water connections: -
Charge Description Cat I Cat IA Cat II Cat IIA
Opening fee 250 250 250 250
Water advance (Which is adjustable in first bill) 1000 1000 - -
Occupier Security (In all cases other than owner as per Sale deed, registered GPA, allotment letter of DDA etc.) 250 250 500 500
Trade Advance Nil NIL NIL Three month’s average bill as assessed by
ZRO. Three month’s average bill as assessed by
ZRO.
Road Restoration charges (Water) 800(For JJR Rs.200/-) 800 1600 1600
Special Reading charges 20 20 20 20
Meter Security 15 mm to 300 mm sized water – As per the actual cost of water meter to the Board, which will be recovered in equated installment spread over a period of three years.
Meter Rent/ Meter Maintenance charges (per month)
(Applicable in case of DJB meter)
As per the following sizes of Meter
15 mm : Rs 20
20 mm : Rs 20
25 mm : Rs 30
40 mm : Rs 40
50 mm : Rs 40
80 mm : Rs 50
100 mm : Rs 100
150 mm : Rs 150
200 mm : Rs 200
What is a Bulk Connection?
for bulk supply of water through a ferrule size of more than 6.4 mm.
What is the procedure for obtaining a bulk water connection for Group Housing Societies etc?
Bulk connection means sanctioned connection Bulk connection means sanctioned connection A Bulk Water Connection can be applied on the same form as mentioned above along with sanctioned plan of the building. It will be approved by the Engineer Incharge concerned, subject to approval of the sanction by the Plannning Divison situated at Varunalaya Complex Phase-I, Jhandewalan, Karol Bagh of DJB and deposition of Infrastructure Charges. The application for new bulk water connection is to be submitted in the office of the area MNWS office.
‘Infrastructure charge’ are levied on the developing agencies as well as on the individual owner of plot/property size of 200 square meters or more at the time of approval of water/sewer schemes as per the procedure and by the authority.The files for working out the infrastructure charges for the plot size of 200 Sq.M. to 500 Sq. M. will be though submitted in ZRO office but Infrastructure Charges will be calculated by the JE, Water Emergency of that particular zone, to avoid delay. The JE concerned is bound to return the file within three days
to the ZRO.
The files in respect of 500 Sq. M. and above area and in respect of big institutions, factories, hotels and such utilities will however be dealt by the planning wing of the DJB at Varunalaya Phase-I. SE(Plannning)Water/ Draianage will ensure that file, if received with all documents, must be returned within a period of 10 days to the ZRO/EE.
What is the procedure for regularization of unauthorized water connections?
be Regularized, subject to the technical legal feasibility and a payment of following Charges:-
• Penalty of Rs.3000/-.
• Water On payment of the following charges, an unauthorized water connection can Charges for the respective Category for the past three years.
• Water Development Charges wherever applicable.
• Usual initial charges such as opening fee, water advance and Road Restoration
Charges etc.
Whom should I approach for getting the un-authorized connection regularized?
The office of the Zonal Revenue Officer of the area can be approached for applying for regularization of unauthorized connection.
Query 10:
Does the DJB charges any rent towards installation of meter? What is the amount?
Response
In case, the meter is provided by the DJB, a rent is chargeable. In case, the meter is private owned, no rent is chargeable. The meter rent is for different sizes of meter. The
Whom should I approach for getting the un-authorized connection regularized?
The office of the Zonal Revenue Officer of the area can be approached for applying for regularization of unauthorized connection.
Query 10:
Does the DJB charges any rent towards installation of meter? What is the amount?
Response
In case, the meter is provided by the DJB, a rent is chargeable. In case, the meter is private owned, no rent is chargeable. The meter rent is for different sizes of meter. The
Does the DJB charges any rent towards installation of meter? What is the amount?
In case, the meter is provided by the DJB, a rent is chargeable. In case, the meter is private owned, no rent is chargeable. The meter rent is for different sizes of meter. The
rent is payable for functional meters on monthly basis and is included in the water bill of the consumer. The rent chargeable is Rs. 20 per month in case of water meters of normal 15 mm size for domestic use.
What is Water Development Charge?
Water Development Charge is a charge which is recovered from the plot holders of the colony where water lines are laid by the Delhi Jal Board and water services are commissioned.
What are the rates of Water Development Charges?
Rate of Water Development Charges are as below:
Period Rate Per Sq.m. (Rs.)
06-12-99 to 31-03-2001 110/-
01-04-2001 to 31-03-2002 123/-
01-04-2002 to 31-03-2003 138/-
01-04-2003 to 31-03-2004 155/-
01-04-2004 to 31-03-2005 174/-
01-04-2005 to 31-03-2008 195/-
01-04-2008 to 31-03-2010 250/-
01-04-2010 to 31-05-2011 329/-
01-06-2011 to 31-03-2012 405/-
01-04-2012 to 31-03-2013 440/-
Note:- Consumer is requested to contact the concerned MNWS office to check the exact rate of Development Charge as per the notification issued in respect of particular colony/locality.
What are the rates of water charges for construction purposes (Cost of water) for residential buildings?
A.In case a consumer utilize Board water for minor Alteration /construction like plastering of walls, roofs, floors, fixation of wall and floor tiles, after advance intimation to the ZRO concerned, the consumer is liable to pay the cost of water on following rates:-
1. For Janta/LIG flats or plot area upto 40 sq.m.(for single floor) Rs.2,500/-
2. For MIG/HIG or plot area upto 80 sq.m.(for single floor) Rs.4,000/-
3. For plot area from more than 80 sq.m. to less than 200 sq.m.(for single floor) Rs.7,500/-
4. For area of 200 sq.m. or more as assessed by area Z.E. but not less than
Rs.7,500/-
B. In case the consumer wishes to utilize Board water for additional/major construction such as casting of roof slab, construction of additional room, the cost of water will be levied on the following rates:-
1. For Janta/LIG flats or plot area upto 40 sq.m.(for single floor) Rs.4,000/-
2. For MIG/HIG or plot area upto 80 sq.m.(for single floor) Rs.7,500/-
3. For plot area more than 80 sq.m. as assessed by area Z.E. but not less than
Rs.10,000/-
Note:-
1. The consumer will keep his water meter in functional mode during the whole of the period of construction and will intimate the ZRO when the construction is over.
2. Penalty in case the consumer fails to give advance information to ZRO about the construction or fail to keep the meter in running condition. For imposition of penalty the special magistrates of the Board will take the cognizance as per the provision prescribed in schedule IV of the Act.
Which types of consumers are covered under Category-II A?
Government offices / Institutions, Govt schools, Govt aided schools,etc fall under this special category under the broad classification of Commercial / Industrial Category and they will be eligible for remission
What is Water Consumption charge?
It indicates the charges for volumetric consumption of water for the period as indicated in the bill, determined on the basis of consumption of 30 days of the consumer.
Under which categories / uses does the DJB give sanction for water supply? What are the categories of consumers with DJB?
DJB sanctions water connections to consumers under four classifications/categories depending upon the nature of the use of premises or use of water: -
1. Category - I (Domestic) :- For Domestic Purpose.
2. Category – I(A) (Non-Domestic/Mixed) :- Mainly used for domestic purpose but having such commercial activity in part of property where non intensive use of
water is there.
3. Category - II (Commercial/ Industrial) :- Such premises where extensive use of water like Dhaba, Restaurants, Factories etc. exists.
4. Category - II (A) :- Mainly for Govt institutions having Rain Water Harvesting provision and/or Waste Water Recycling.
Which type of consumers are covered under Category-I (Domestic)?
Following are the examples of connections under the Category-I (Domestic) :-
1. Premises used for residence.
2. Hostels of Educational Institutions of the Government, working women’s hostels run by the Government.
3. Govt. recognized destitute homes, orphanage, charitable homes, blind schools,
schools for physically handicapped persons, spastic children.
4. Piaos meant for drinking purposes.
5. Place of worship, cremation grounds, cemetery.
Which type of consumers are covered under Category-IA(Mixed Use)?
1. Applicable to the residential premises where commercial use co-exists in
the part of premises and the water use is non-intensive such as in case of kiryana
shop, stationery
shop, telephone booth etc.
2. Not applicable in case of residential premises where water use is intensive like in case of
sweet meat shop, Dhaba etc being run in the part of the
residence.
Which type of consumers are covered under Category-II ?
n DOMESTIC CATEGORY (CATEGORY-I) or MIXED USE CATEGORY (CATEGORY-IA)
If in a residential property, there is also non- residential use of the property, would the DJB still charge the consumer at domestic rate?
It will depend upon the use of water. If non intensive use of water is there in commercial activities, DJB will treat it under Cat. IA e.g. office of property dealers, shops, atta chakki, doctors clinic etc.
on there total monthly bills provided they adopt the rain water harvesting / waste water recycling.
What is the schedule of rates?
(Category-I).
Volumetric charge – The rates will be twice the rates as applicable under Domestic
Category
(Category-I)
Plus Sewerage maintenance charge : 60% of water volumetric charge
COMMERCIAL/ INDUSTRIAL CATEGORY (CATEGORY – II)
Monthly Consumption (Kilolitre)
Service Charge (In Rs.)
Volumetric Charge (Kilolitre) (In Rs.)
0-10 484 12.1
10-25 726 24.2
25-50 847 60.5
50-100 968 96.8
>100 1089 121
Plus Sewerage maintenance charge : 60% of water volumetric charges.
In addition to above, additional sewerage charges as mentioned below for the specified units will be
charged. This charge will also be applicable irrespective of existence of DJB water connection
provided the sewage generated is disposed through the DJB’s sewerage system.
GOVT INSTITUTIONS/ OFFICE (CATEGORY-II A)
Tariff applicable will be the same as applicable to the commercial/ industrial category
(Category-II)
with a provision of 15% rebate on total bill amount to these units which provide certificate of
adopting measures for water harvesting and/ or recycling of waste water.
Note : The above rates are applicable w.e.f. 01.01.2012 and every year it will be enhanced by 10%
as per resolution of the board.
In Group Housing Societies, does the DJB sanction individual household connections?
No individual water connection is sanctioned to each household in the society.
Are all the water connections required to have meters?
Yes, as DJB intends for 100% metered supply. Hence consumers can install private water meters.
Are all the water connections required to have meters?
Yes, as DJB intends for 100% metered supply. Hence consumers can install private water meters.
In the case of un-metered connections, what is the basis of the billing?
For un-metered connections, the department charges at a flat rate of consumption of 22
KL per month for domestic use.In Rural areas @ 20 KL per month and 15 KL per month per floor in JJ resettlement colonies.
If the meter read average or the previous consumption is not available, then the billing will happen on the basis of plot area which is 22 KL for less than or equal to 200 sq yards, and 33 KL for more than 200 Sq yards for domestic category only. For other categories, there will be no billing if the meter read average or the previous consumption is not available.
Is it essential that meters are installed by the DJB only? From where can I get my own meter installed? Which are the permissible meters?
A meter can be installed by the consumer also by purchasing meters of specifications as permitted by the DJB.
What are the specifications of the approved meters?
The specification of approved / permissible meters are: - 15mm, class B, multi jet, inferential type, magnetically coupled conforming to the IS: 779/1994 and the body of the meter shall be brass/ bronze as per IS: 779/1994. Meter should have the Manufacturer's Test Certificate
How many days are allowed for making payment of water bill charges?
The due date for making payment is shown in the bill and in case of default, surcharge is also to be paid. Normally, 15 days time is allowed for making payment from the bill date.
I am not satisfied with the meter reading. Whom should I approach?
You should be contacted in our consumer care centre. There is a provision of special reading after paying an amount of Rs. 20/-.
What are rates for meter security? Is it refundable?
Water Meter Security is charged in case of meters provided by DJB. The consumer can obtain DJB's water meter against security amount as given below:-
SIZE OF METER SECURITY 15 mm Rs.400/- 20 mm Rs.800/- 25 mm Rs. 1000/- 40
mm Rs. 1600/- 50 mm Rs. 2700/- 80 mm Rs. 3400/- 100 mm Rs. 5000/- 150 mm Rs.
7600/- 200 mm Rs.20000/- 300 mm Rs. 29000/-
At the time of surrender of water connection/meter, the meter securi
What is the normal billing Cycle?
Normal billing cycle is quarterly basis.ty is refunded to the co
What are the charges raised in the water bill?
Following charges are raised in the water bill: -
(i) Water Consumption Charge :- Based on the volumetric consumption on monthly basis.
(ii) Service Charge :- Fixed access charges as per the slabs based on the monthly consumption.
(iii) Sewerage Maintenance Charge @ 60% of (i) above, subject to existence of sewer connectivity in the area.
(iv) Meter Rent if meter has been installed by the DJB.
(v) Pollution Cess Charge @ .02 paisa per kiloliter as fixed by the Central Pollution
Control Board.
(vi) Arrears, if any.
(vii) Surcharge, if payment is not deposited within stipulated time. (viii) Other charges as specified in the bill.
nsumer.
What is the rate of Water Consumption charge as per the present tariff?
In the existing tariff, the rates of Volumetric charge have been structured on the basis of consumption of water on monthly basis and depend on the category and consumption.
What is Water Cess Charge?
It is a charge being levied by the Central Government under Water (Prevention and
Control of Pollution) Cess Act 1977. Presently it is being charged @ 2 paise per Kl.
What is the rate of Late Payment Surcharge?
5% surcharge is levied if payment is not made within the due date as indicated in the bill. Surcharge is payable on the total amount due.
What is the criteria for raising of water bill if water meter stops functioning?
If the consumer meter had remained functional for last 12 months, then consumer will be billed on the average consumption (actual average) of that 12 months period till new meter is installed/ fixed by DJB, if actual average for the consumer is not available then consumer is billed on the Meter Reader Average else the department charges at a flat rate of consumption of 22 Kl per month(for area less then 200 sqm.) & 33 KL per month (for area more than 200 sqm.) for domestic use. In Rural areas @ 20 KL per month and
10 KL per month per floor in JJ resettlement colonies.
What are misuses of water?
Use which is not permitted for the purpose for which the connection has been sanctioned would be treated as misuse. The use of water for construction of building without prior information and permission of the Delhi Jal Board is also a serious misuse of water.
What are the rates of water charges for construction purposes (Cost of water) for residential buildings?
A.In case a consumer utilize Board water for minor Alteration /construction like plastering of walls, roofs, floors, fixation of wall and floor tiles, after advance intimation to the ZRO concerned, the consumer is liable to pay the cost of water on following rates:-
1. For Janta/LIG flats or plot area upto 40 sq.m.(for single floor) Rs.2,500/-
2. For MIG/HIG or plot area upto 80 sq.m.(for single floor) Rs.4,000/-
3. For plot area from more than 80 sq.m. to less than 200 sq.m.(for single floor) Rs.7,500/-
4. For area of 200 sq.m. or more as assessed by area Z.E. but not less than
Rs.7,500/-
B. In case the consumer wishes to utilize Board water for additional/major construction such as casting of roof slab, construction of additional room, the cost of water will be levied on the following rates:-
1. For Janta/LIG flats or plot area upto 40 sq.m.(for single floor) Rs.4,000/-
2. For MIG/HIG or plot area upto 80 sq.m.(for single floor) Rs.7,500/-
3. For plot area more than 80 sq.m. as assessed by area Z.E. but not less than
Rs.10,000/-
Note:-
1. The consumer will keep his water meter in functional mode during the whole of the period of construction and will intimate the ZRO when the construction is over.
2. Penalty in case the consumer fails to give advance information to ZRO about the construction or fail to keep the meter in running condition. For imposition of penalty the special magistrates of the Board will take the cognizance as per the provision prescribed in schedule IV of the Act.
Where can the payment of water bills be made?
(i) MNWS Bill collection centres: Payment of water charge can be deposited in any of the Zonal Cash Collection Centers of MNWS during 9.00 a.m. to 5.00 p.m on any working day.
(ii) Payment can also be deposited in any of the authorized branches as mentioned below.
a. Corporation Bank b. ICICI Bank
c. Allahabad Bank.
d. State Bank of India e. Syndicate Bank
f. IDBI Bank
(iii) Jeevan Centres.
(iv) Online payment : The payment of water bills can be made online from the MNWS Consumer portal as well, But there will be some transaction charge that will be levied in this case.
Whether RWAs have been authorized to accept payments of water charges etc. on behalf of DJB and what is the process?
Yes, DJB authorizes RWAs which are duly nominated by the Govt. of NCT of Delhi under Bhagidari Scheme to accept payments of water charges and development charges by cheques only, on behalf of DJB. The Association issues the receipts from G-8 Book. Office stationery will be provided by the Board. Cheques, thus received by the association will be collected by an official of the concerned ZRO of DJB. For availing the above facility, the president of the association will enter into an agreement, with the concerned Joint Director (Revenue).
What facilities have been given to the Senior Citizens by the Delhi Jal Board?
1. Separate queue for senior citizens is allowed at cash collection center.
2. Collection of payment of water bills by the official of DJB at the door-steps of senior citizens after prior appointment.
In the event of house remaining vacant, can the bills be revised on Minimum charge basis?
In the event of house remaining vacant and water is not used, bill may be revised on minimum charge basis i.e., only the service charges will be billed. However, onus of proving the vacancy of the premises during the period of billing will be on the consumer and he/she has to produce relevant documents like electricity bill etc. verifying the vacancy of the property during the period for which request for minimum charge is being made..
What is the penalty in case of dishonored cheques?
20% of the demand raised in the bill for which cheque was issued. In addition, the person can be prosecuted under the Negotiable Instrument Act.
What is the procedure for refund of Meter Security?
Refund of meter security/advance may be applied for by the Registered Consumer who has ceased to exist as Registered Consumer after mutation of water connection or the water connection is disconnected on request. Application for refund of advance/meter security is to be accompanied with original receipt vide which meter security/advance was deposited.
Is it necessary to use the services of a licensed plumber for repairing of water service pipe emanating from ferrule?
Yes, only the licensed plumbers are allowed by the DJB for the above purpose.
Is there any concession or exemption to religious places or charitable institutions?
No, water charges in category I am levied as per the existing water tariff in such institutions.
http://www.biharceramics.com/djb/faq.php
Recovery of development charges for water supply and sewage facilities in respect of the public utility institution in regularized colony shall be as under:-
Green area of institution Rebate/ Concession in Development Charges
(a) Institutional Building upto 2 acres. 50% of the plotted area.
(b) Institutional Building beyond 2 acres.33.33% of the plotted area.
The recovery rate shall be the same as worked out in respect of the residential area of the colony in which the institution is situated. The term public utility institution will include Govt./MCD/ DDA/NDMC or aided educational Institution, Non-Profit making hospital/dispensaries/ community centers and religious institutions which are purely and entirely used for worship and no portion of these are used for commercial/ residential purpose.
The facility shall be extended to new cases only where services are yet to be laid against new estimate to be prepared. This concession could be also extended to the
colonies where works are in progress and area is yet to be notified. However, this facility shall not cover old cases where connection already exists.
Is obtaining of sewerage connections mandatory in colonies where sewerage system has been provided?
Yes, onus for obtaining mandatory sewer connection after payment of development charges lies on the plot holders right from the date of Notification and the water supply shall be liable to be disconnected in case of default.
What are the timelines for providing different services as per e-SLA?
Time limits fixed under e-SLA for various activities are as under:
1. For sanction of new connection - 35 days.
2. For Mutation - 15 days.
3. For disconnection on request - 15 days.
4. For reopening - 15 days.
Can the benefit of domestic category be claimed in notified industrial areas on the above criteria?
No, notified industrial areas are not allowed this benefit.
What if I have made a payment for a bill but the newly generated bill again shows the same as arrears?
The consumer has to contact the area ZRO and needs to show the payment receipt to the ZRO. If the receipt is genuine, the ZRO can pass an adjustment equivalent to the amount of payment made, in the RMS application and the next bill from RMS will show the amount as adjusted. Meanwhile, the consumer has to make the payment of the bill generated from RMS for the bill amount minus the payment amount for which the receipt has been shown.
Are there any online services provided by MNWS?
The consumer
can visit the RMS portal through the MNWS Website. This link
will provide online functions for the various processes. The new connection can be applied online, Mutation and
Disconnection can also be applied online. The last 5 bills and
payments made in RMS can be viewed.